Tender pricing built from real production rates, with every assumption written down.

We build the estimate from the ground up: quantity take-off from drawings or the BOQ, plant and labour costed on real production rates, materials with wastage, preliminaries, risk and contingency, and a written assumptions register. It's priced for how the job will actually be run, not how it looks on paper.

You receive

  • Priced BOQ or schedule of rates
  • Take-off and rate build-ups
  • Assumptions, exclusions and risk register
  • A programme outline where pricing depends on it

Already priced it yourself? Get an independent check before you submit: Estimate Review, $1,450 fixed.

The tender tool

Run the job before you price it

The tender documents never tell you the whole job. The culvert nobody drew. The rock you have to import for the bank. The fortnight of rain in January. Run the Job is the tool we built to find them first.

Load the job, check it for scope gaps, plan your crews and plant, then run it through 20-odd years of local rain and see what it does to the price. Change the plan and run it again. When the number holds up, lodge it.

  • Scope gaps and missing line items, before you price
  • Crews, plant and the bottlenecks that stop production
  • Hold points and clash points, written down
  • Wet season or dry, on real local rainfall
Run the Job checking a tender: scope and pricing schedule, WHS plan, traffic plan, plant tickets and insurances